Sunday, March 30, 2008

Tile and Doors

The tile floors are going in. The nook and mudroom is layed out, and the master bedroom floor is done except for a small section. In the nook, we put the fossil slate. The color looks a bit washed out. Once they're dusted the color comes through, and we'll finish them with some enhancer. The front foyer will get the same. The bathroom has travertine tiles, and it look pretty good, I think anyways.


Travertine Master bath floor



Mudroom above, eating nook below



The carpenters also started setting the doors. The doors come in their frames and jams, and they install them into the openings. The basement is first, and they made some adjustments to the headers to fit them evenly. They've also started fitting the trim, with the top trim boards already placed on most of the doorways.



The doors are 7' to give perspective. Above is the lower level hall to the guest master, which is the doorway to the right of the 2 closed doors. The wood is alder.



Above is the long hallway to the guest bedrooms, downstairs laundry and equipment room. Below is the center meet closet doors in a guest room.

No comments: