Travertine Master bath floor

Mudroom above, eating nook below

The carpenters also started setting the doors. The doors come in their frames and jams, and they install them into the openings. The basement is first, and they made some adjustments to the headers to fit them evenly. They've also started fitting the trim, with the top trim boards already placed on most of the doorways.

The doors are 7' to give perspective. Above is the lower level hall to the guest master, which is the doorway to the right of the 2 closed doors. The wood is alder.

Above is the long hallway to the guest bedrooms, downstairs laundry and equipment room. Below is the center meet closet doors in a guest room.