Sunday, July 22, 2007

Retaining wall complete




The wall got finished up (mostly) and looks really good. This should shelter the back yard well. A path will go down the upper level from the patio/deck to the back yard instead of stairs from the deck. Capstones will go across the top level of the wall. These will match what will sit on top of the columns.
I met with the heating/ventilation contractor last weekend to discuss placement of the AC, ducts and vents. We are also put in air to air heat exchangers. Since the house has radiant heat and is sealed, there is no outside air coming in as there would be with central forced air. The exchangers allow in fresh air without losing a lot of heat in winter or cool air in summer.
The roof is still not done. There seems to be a problem with the metal to fit over the entry. No leaks though. This can be frustrating.

Chapman seems content, however, to stay in the same yard.

Sunday, July 08, 2007

Retaining wall




New for the week is the retaining wall. It starts at the end of the concrete foundation retaining wall where the door was cut for a "shed", and goes about 25 feet down past the deck. It will be about 4.5 feet for the lower section, with a second wall above it and set back a couple of feet which will be about 4 feet high. Eventually it will be filled in behind with dirt to allow a pathway from the patio to the back yard.
So far this is about 4 days work. We don't know how many guys are working on it but they do have a little bobcat loader. Should finish up this week.
The roof? Hasn't been touched further. The metal for the entry was dropping off. I guess it has to be aged first.