Saturday, August 12, 2006

Roof




After getting the floor soaked one time too many, we've finally got some roof top covering going. Some adjustments were required for the roof set up to allow appropriate drainage. The tar paper is set up for flow, and set in place with roofing nails. Flashing will be set up on the corners. Wood slats go on next and the tiles will be set on those. The seams are all tarred underneath first. Before the final tiles go on, the heating system and fireplace ducts/vents have to be cut through, and flashing will be put around. This stuff will help keep the insides dry though and the wood should dry well with our low humidity.