Saturday, November 25, 2006
Sunny Day
George the framer was working today, making the bathtub frame for the master bath. Work continues on the front corbels and braces, so far looking nice. Windows are in over the entryway. We spent a few hours yesterday going over details on additional framing work. Bathtubs were delivered. We're going to have to move the drain for the guest master, digging up concrete.
Pics on flickr.
For a look at the tubs, the Guest suite tub is here, and the Master tub can be found here.
We also ordered the wood for the flooring, 8-12 inch planks. The wood will be specially dried and prepared for radiant heat flooring, and we already met with the installer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment