Saturday, February 04, 2006
Concrete Walls
The concrete is poured and set. The tall walls are to the front of the house.
The walls are about 12 ft. The pilons in the middle there are up about 2 ft. This will be filled with gravel, and topped with the slab, leaving room for a 10 ft ceiling.
The opening behind Lori is the area below part of the garage, which we had excavated out for an extra basement room.
Dirt will be filled to the top of the back frost wall, towards the front of the pic. More pics on flickr.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment